Process

Eleven weeks, four stages, one team.

Off-site construction only works if the design is settled before fabrication starts. Our process is arranged around that single idea.

Stacked shipping containers forming modern architecture in an urban setting
  1. 01

    Brief and site

    We start with use, site and timeline. Measurements, access, ground conditions and power are established before a line is drawn.

  2. 02

    Design

    Plans, elevations and a fixed material schedule. You approve a drawing set, not a mood board, and the price follows the drawings.

  3. 03

    Fabrication

    Structure, insulation, services and finishes are built in our yard under cover, where tolerances and quality can be controlled.

  4. 04

    Delivery and install

    Transport, crane and connection. Most projects are watertight on the day they arrive and handed over within the week.

What's included

One scope, no surprises.

  • Site survey and access study
  • Plans, elevations and sections
  • Fixed material and finish schedule
  • Structural steel and insulation package
  • Electrical, plumbing and drainage first fix
  • Transport, crane and installation
  • Commissioning and handover file
  • 12-month structural warranty